Skip to main content
Advertising

Ed cetera

Join the informed, opinionated journalists of The Times' editorial staff in lively discussions at our blog Ed Cetera.

January 16, 2013 at 4:31 PM

  • Share:
           
  • Comments (6)
  • Print

The 787’s battery of troubles

Delivery of the first 787 Dreamliner in September 2011 to All Nippon Airways was a bright start for the new Boeing commercial jet.

Wednesday’s grounding of U.S.-registered, Boeing 787 aircraft by the Federal Aviation Administration is a rare indignity. The emergency airworthiness directive was issued over worries about a fire hazards due to battery failures. All Nippon and Japan Airlines had already grounded their planes.

Caution is appropriate, of course. An in-flight incident and one on the ground in Boston could not be ignored. One cannot know if this is a legacy of a plane built in bits and pieces beyond the company’s usual span of control. The FAA does not know either, and the agency’s statement on Wednesday noted its “continuing review of the aircraft’s design, manufacture and assembly.” Everything is getting a deep look.

Boeing builds the best planes. A company rich with talent will solve this mystery, and get the 787 back to work.


Most Popular Comments
Hide / Show comments
The quality problems with the 787 could be fatal to Boeing. I'm glad to see that... MORE
I like this "Building the Dreamliner" animation. I really do! ... MORE
"One cannot know if this is a legacy of a plane built in bits and pieces beyond... MORE

News where, when and how you want it

Email Icon

Hurry! Last two weeks to save 15%.

Hurry! Last two weeks to save 15%.

Reserve your copy of "The Seattle Sketcher," the long-awaited book by staff artist Gabriel Campanario, for the special price of just $29.95.

Advertising

Advertising

Advertising

Blogroll

The Seattle Times Historical Archives

Browse our newspaper page archives from 1900-1984


Advertising