Skip to main content
Advertising

Originally published July 23, 2013 at 2:54 PM | Page modified July 24, 2013 at 6:39 AM

  • Share:
           
  • Comments (8)
  • Print

Boeing finalizes major changes for 737 MAX

Firm configuration of the 737 MAX is completed.

Seattle Times aerospace reporter

Most Popular Comments
Hide / Show comments
John, Please stop. MORE
Yes John, please. For the love of God. MORE
John, You are definitely stubborn. When someone points out that your ramblings are... MORE

advertising

Boeing said Tuesday that it has firmed up the configuration of its forthcoming new single-aisle derivative, the 737-MAX.

Engineers have finalized the major changes from the current 737NG models — including new fuel-efficient engines, new split winglets, and redesigns to the nose landing gear and the tail cone — and will now begin the detailed design phase.

Keith Leverkuhn, 737 MAX program manager, said the new jet will also feature improved connectivity, allowing easier downloads of maintenance and performance data for mechanics and more wireless access for passengers

Final assembly of the 737 MAX 8 is scheduled to begin in 2015 and first delivery to an airline in the fall of 2017.

Dominic Gates: (206) 464-2963 or dgates@seattletimes.com

News where, when and how you want it

Email Icon

The summer is wide open.

The summer is wide open.

Follow our three-part "Washington's National Parks" series running through August 10 for an in-depth look at some of our local treasures.

Advertising

Advertising

The Seattle Times photographs

Seattle space needle and mountains

Purchase The Seattle Times images


Advertising
The Seattle Times

The door is closed, but it's not locked.

Take a minute to subscribe and continue to enjoy The Seattle Times for as little as 99 cents a week.

Subscription options ►

Already a subscriber?

We've got good news for you. Unlimited seattletimes.com content access is included with most subscriptions.

Subscriber login ►