Advertising

The Seattle Times Company

NWjobs | NWautos | NWhomes | NWsource | Free Classifieds | seattletimes.com

Living


Our network sites seattletimes.com | Advanced

Bellevue Blog

Seattle Times staff reports on news and happenings related to the City of Bellevue and the neighborhoods within it. Video: Meet the bloggers.

October 30, 2009 at 1:07 PM

Comments (0)     E-mail E-mail article      Print Print      Share Share

Drilling to test soil for East Link to begin

Posted by Nicole Tsong

Sound Transit will start collecting soil samples next week in Bellevue as engineers assess the soil and groundwater conditions in locations along the proposed East Link light rail route.

Drilling will start as early as Monday, with soil samples collected from as deep as 200 feet. The drilling is limited to the alignment recommended by the Sound Transit board in May, which includes two options for downtown -- a surface route and the more expensive tunnel route.

Geotechnical contractors will drill about 100 soil borings near areas where structures like transit stations, elevated platforms, retained earth fills and tunnels are proposed, Sound Transit said.

Drilling will take place along Bellevue Way Southeast, the Mercer Slough area, 112th Avenue Southeast, downtown, Northeast 12th Street and the Bel-Red area, and will continue through mid-2010.

Drilling will limit some street parking, and crews will direct traffic and pedestrians. Drilling equipment noise is similar to a running truck engine with some hammering, Sound Transit said.

E-mail E-mail article      Print Print      Share Share

Comments
No comments have been posted to this article.

Recent entries

Advertising

Advertising

Advertising

Browse the archives

October 2009

September 2009

August 2009

July 2009

June 2009

May 2009

Meet the bloggers

Video | Get to know Bellevue Blog reporters Nicole Tsong and Katherine Long.