The Seattle Times

2 of 3
KEN LAMBERT / THE SEATTLE TIMES
Advertising

Wednesday, November 14, 2012

Work on 520 bridge continues as divers check fixes, cracks seep

Julie Meredith, state 520 bridge-replacement program director, is inside a pontoon cell on Lake Washington. Repaired leaks are not a problem and won't hold up construction, the state says.