The Seattle Times

1 of 2
ALAN BERNER / THE SEATTLE TIMES
Advertising

Friday, March 4, 2011

Big transit-tunnel tools get tested

Two giant tunnel-boring machines are being assembled in Tacoma. The machines, called TBM's, will dig side-by-side tunnels from the University of Washington station at Husky Stadium to Capitol Hill. The machines are 21 feet in diameter at the cutter face.